The School: White Day Wiki
The School: White Day Wiki
Advertisement
The School: White Day Wiki
Yeondu Highschool Remake

Exterior of Yeondu High School (Remake).

Main Building is a building located in Yeondu High School and the main building of the school. The main protagonist enters this building at the beginning of the game.

The main building is divided into two sections, Main Building Section 1 has the 2nd-grade classrooms and Main Building Section 2 has specific classrooms.

The building is very old. The hallways are dark, some light switches are broken and creaking sounds are heard all throughout it, especially the wooden floorboards of Section 2.

Main Building, Section 1[]

This is the first location explored in White Day: A Labyrinth Named School and The School: White Day by the protagonist, Lee Hui-min.

Basement[]

The was locked in 2001.

1st Floor[]

2nd Floor[]

3rd Floor[]

This floor was locked in 2001.

4th Floor[]

This floor was locked in 2001.

Main Building, Section 2[]

This Section has offices and special classrooms (Science Lab, Art Room, etc.).

1st Floor[]

2nd Floor[]

3rd Floor[]

4th Floor[]

Further Notes[]

  • The main building in initial versions of White Day: A Labyrinth Named School was connected to all other sections (not divided into Sections) and loaded all at once, but the building was eventually divided into sections with each one loaded separately because of computer specification problems at the time (in 2001). Also, the 3~4 floor (1st-grade classrooms) in Section 1 were removed.
  • Pre-release presentations of The School: White Day showed what seemed to be the basement area being explored in a scrapped Multiplayer Mode.
  • The basement and the 3rd and 4th floors of Section 1 can be explored for the first time in The School: Swan Song.
  • In the PC/PS4 ver, the passage connecting to New Building on the 3rd floor was removed, unlike the Original or Mobile remake version.

Gallery[]

Advertisement