The School: White Day Wiki
Register
Advertisement
The School: White Day Wiki
I story

This is an example image

Construction Area Note is a note White Day: A Labyrinth Named School and Remake. It details the data of Air duct.

Location[]

It is found in hallway leading to the Home Economics Classroom and Workshop on the 1st floor of Main Building, Section 1 of Yeondu High School.

In the remake ver, it is attached to a ladder in the hallway near the Workshop.

Transcript[]

2001[]

Construction Memo

The main building's first floor needs some lighting work. Oddly enough, the switchboard wires in the machine room are tangled up, so we may need to strip a lot of the floorboards and wall sheets back.

If this work is needed, then the extractor fan connected to the machine room, home economics room, and the girl's bathroom will need to be removed.

공사구역의 쪽지

본관 1층 조명 수리작업

-예상과는 달리 기계 실습실의 배전반으로부터 나온 배선이 엉망이라서 큰 규모의 공사를 요망.

-전체 공사를 실시할 경우에는 기계 실습실가정 실습실, 화장실까지 연결된 환풍구를 제거해야 함.

Nota sobre a Construção

O primeiro andar do Prédio Principal precisa de um serviço de iluminação. Estranhamente, os fios do quadro de distribuição na Sala das Máquinas estão emaranhados, então pode ser necessário que arranquemos vários assoalhos e papéis de parede.

Se este serviço for necessário, então o exaustor que conecta a Sala das Máquinas, a Sala de Economia Doméstica e o Banheiro Feminino precisará ser removido.

2015[]

Construction Area Note

Lightning repair work in the first floor of the Main Building.

- The Workshop's wiring will be a larger job than anticipated.

- The repair calls for more extensive construction work; removal of the ventilation connecting the Workshop, Home Economics Room, and the bathrooms will be necessary.

공사구역의 쪽지

본관 1층 조명 수리 작업 내역

- 예상과는 달리 기계 실습실의 배전반으로부터 나온 배선이 엉망이라서 큰 규모의 공사를 요망.

- 전체 공사를 실시할 경우에는 기계 실습실가정 실습실, 화장실까지 연결된 환풍구를 제거해야 함.

Aviso sobre a área de construção

Processo de reparo da iluminação no primeiro andar do Prédio Principal.

- A fiação da Oficina será uma tarefa maior do que o antecipado .

- O reparo precisará de um trabalho de construção mais extenso; será necessário realizar a remoção do sistema de ventilação conectando a Oficina, a Sala de Economia Doméstica e os Banheiros.

Note sur la zone de travaux

Réparation de l'éclairage au rez-de-chaussée du bâtiment principal.

– L’installation électrique de l’atelier nécessite des travaux plus importants que prévu.

– Les réparations nécessitent un chantier plus conséquent : il faudra retirer la ventilation qui relié l’atelier, la classe d’éducation ménagère et les toilettes.

Gallery[]


Advertisement